English
Home About Us Product Capability Engineering Quality Service Culture&News Contact
Enginneering
Enginneering

Engineering concerns and our answers:

      1.How about the tolerance?

      Mold tolerance is 0.02MM, product tolerance is 0.02~0.05MM

     2.What Steel do you usually use?

      P20, P20HH, H13, S-7, S136, SKD61, 420, 420SS, NAK80, 1.2311, 1.2711, 1.2344,1.2083, 1.2316 and 1.2379.

     3. What standard components do you usually use?

      The standard components from LKM, DAIDO, HASCO, DME.

     4. What Hot runner system do you often use?

      YUDO, SINO, HUSKY.

     5. What's the mould base you often use?

      LKM, DME, HASCO, it depends on customer’s requirement.

     6.What do you need for Quotation?

      We need 2D part drawing & 3 D drawing, and specific mold & part requirement.

     Note: drawing format( 2D file- dwg, dxf/pdf, jpg), 3 D model format( igs, x_t, prt)

      7. What’s your mould lead time?

       Normally mould finished in 4-5 weeks, it depends on the mould structure and Size.

     8. What’s your quote time?

      Once we get inquiry from customer, we will try to send quotation back within 1-2 days.

     9.What’s your after sales?

      Our customers mold drawing and all date of projects will be kept in our database for 5 years, when you need our technical

      support or service, we are trying our best to assist with you.

      10. What’s design software do you use?

       UG, Pro-E, Master cam, Solid works, 3D max, CAD, CAM.
 

                                           

2000-2010 Totem Tooling Co.,Limited
Address:NO.118 ChangAn Zhong Road ,ChangAn Zhongxin Industrial Park,ChangAn Town,Dongguan City,Guangdong,China  Zip:523863
Tel:86-769-87015606  Fax:86-769-82586051  Email:info@totem-mould.com